大家好!今天让小编来大家介绍下关于光伏质量工程师简历_考质量工程师如何报名的问题,以下是小编对此问题的归纳整理,让我们一起来看看吧。
文章目录列表:
1.找工作时没做成功的事能写在个人简历上吗?2.考质量工程师如何报名
3.光伏产业质量工程师主要做哪些工作?
找工作时没做成功的事能写在个人简历上吗?
最好还是不要写在简历上。既然你有这种顾虑怕被问及,还是多一事不如少一事。或者你可以换一种填法,写:在实习期间参与网站开发,或有网站开发的兴趣(提前是你投报某网站的工作,或是你真有兴趣开发网站,如果这份工作与网站无关,那根本不需要去填这一项经历)
有时我们填写自己的经历,并不是填得越全就对自己有帮助,也需要“投其所好”。一板一眼并不代表诚实,会变通也很重要,要懂得扬长避短,在实践中不断改进。
祝你成功
考质量工程师如何报名
Job performance:
Technology department minister
1, 09, transfer separation products, product line planning, quality tracking and improvement;
2, 10 years, the organization SD (Sauer Danfoss) series valve product development, finish four products directly;
3, 10 years, the completion of the 146 lines, 148 lines, issue the tooling drawings and process arrangement plan;
4, 2011-2012, finished 124 kinds of new brake discs for TRW Europe program development, at the same time completed the TRW Europe the development of high carbon brake disc samples;
5, 2011-2011, complete the company product list, mold, production line position (according to the product and production line features) management. (more than 1500 kinds of products, more than 800 sets of mould);
6, 12 years, complete brake drums project development;
7, 12 years, completed 600 kinds of brake disc production transfer, alignment and the stable quality of work.
Quality management department minister
1, 2009, and passed the TS16949 quality system certification, and is responsible for continuously improving the quality system;
2, in 2012 passed the review and every year for renewal of the supervision and audit;
3, in 2010 passed the SD of the quality system audit, improve effectiveness validation from SD us quality engineer, smoothly into SD qualified suppliers;
4, 2011 by TRW quality system audit, for DF series production ready the production of brake discs. And in 12 years, began to batch delivery.
Foundry technology quality foundry factory director, vice factory director/agent
Department: foundry
Reporting object: casting director (branch manager)
The number of subordinates: 600
Job responsibilities:
Foundry technology quality vice director
1, to track the quality of east long production line improvement;
2, the new material (carbon brake disc) new product material and control the rejection rate;
3, organize foundry engineer, workshop problems for research;
Agent foundry factory director (2008, 4-2009, 2)
1, complete the headquarter of production tasks, and maintain production schedule to coordinate with headquarter;
2, to complete production tasks indicators issued based (yield, scrap rate, delivery period);
3, complete temporary tasks;
4, organization, technology, quality, equipment, production personnel to evaluate production orders, make monthly production deployment;
5, the organization to achieve annual target of production, equipment and technological transformation.
Job performance:
Foundry technology quality vice director
1, complete improvement of east long line brake disc technology, stable product quality;
2, to finalize the design of carbon brake disc materials;
3, improved the technology of single-chip brake disc, solved the monolithic brake disc shrinkage, and improved the monolithic process production rate of the brake disc and labor efficiency;
4, the promotion of a box of four pieces of brake disc process, and make it standardized.
Foundry factory director
1, again according to the actual circumstance of the workshop, make the post capacity and wage norm;
2, lead the casting plant for the first time, finish the monthly output of 4000 tons, and maintain production for 3 months.
Technical engineer
Department: technical department
Reporting object: department minister
Number of subordinates: 0
Job responsibilities:
Casting GongYiYuan
1, the design of casting process and tooling, and tracking improvement;
2, Magma casting internal quality simulation;
3, the casting process and the improvement of the quality;
4, new product development and PPAP submission.
Job performance:
1, 2005, the organization and through the first article and mass production of automotive OEM (responsible for the casting process and Pro/E 3 d mold design, Magma simulation, process documents writing, casting inspection instruction and progress tracking coordination, PPAP submission, on-site training, etc.);
2, 2005-2006, improved the casting tooling design process, using Pro/E, combined with the Magma simulation and manufacture cost, reducing process and make the design process from 3 d to 2 d instead, reduces the design variation; And use this process to develop the two sets of auto bracket mould;
Design 3, 2006, the east long line and hunter line equipment design manual brake disc technology, standardization of the design process.
光伏产业质量工程师主要做哪些工作?
你在那个地区,每个地区报名的流程会略有区别,不过大致都如下:
1、登陆当地的人事考试网(各地区的名字不一样,如深圳是:深圳考试指导中心);
2、查看对应的报考条件说明,看自己是否符合报考条件,如不符合条件,报考和考试通过后,证书也下不来;
3、依据其提示进行操作,一般还要办理网上银行,填写自己的基本资料,工作经历等简历信息、在选定报考的科目(如果你条件合适,一些科目可以申请免考资格)。
大致流程是如此,不过今年已经报名截止了。
光伏产业也分为很多环节,比如硅料提纯、铸锭、拉单晶、切片、电池片、组件、太阳能电站,每个环节都需要一个大车间,都可以组成一家公司。每个环节都需要质量工程师,当然不同车间的质量工程师的具体工作是不一样的。据我所知,质量工程师具体负责生产线作业监控、生产纪律监督、产品质量抽检、生产线异常的记录、合格率的统计、不合格品的分析……而且是要随生产线一起倒班的,白班夜班轮换着上,也很伤身体。
其实,现在中国的工人阶级——哪怕你是本科毕业生,哪怕你是所谓的“工程师”——都是处在一个当牛做马的时代,生产线连轴转,你就也要连轴转,负责设备、工艺的工程师也是如此。